For immediate service or questions, call TODAY 215-428-9300
New Construction
BEFORE - “Dream Pool” wood wall pool with 8” aluminum coping and drop-in steps. The walls are deteriorating and starting to collapse.
DURING - Removing old pool, hand dig in progress.
URING – Wall concreted in place, and vermiculite hard-bottom installed.
AFTER - All new polymer wall pool installed. All excavations were hand dug due to access limited to a 3' area around pool. The new pool was filled with water the same week.
Error: Error validating application. Application has been deleted. Type: OAuthException Code: 190 Please refer to our Error Message Reference for a solution.